Albion South Development 2018 - 19

 

More windows with white walls -- April 20, 2019

Floor 14, windows on 4 and 5 -- April 20, 2019

Reaching to floor 15 with concrete pouring in column and windows on lower 3 floors -- April 26, 2019

All the way to floor 15 -- windows up to floor 10 -- May 29, 2019

Closer view -- May 29 -- 2019

South side with construction elevator -- May 29, 2019

South side with construction elevator -- May 29, 2019

South side with construction elevator and concrete hopper being lowered to truck -- May 29, 2019

Structure through floor 15 and outer windows and balconies through floor 10 from my balcony -- May 29, 2019

Elevator moter and tank complete on top, outer windows through floor 10, and red concrete pump removed from top of parking floor 4 -- June 4, 2019